Installation
Surface preparation - The WILOTEKT surface conditioning primer is brush applied to a dry concrete deck and allowed to dry.

Reinforced mesh - The WILOTEKT glass reinforcement mesh is rolled out over the deck and up all upstands with 10 cm overlaps.

Membrane - The WILOTEKT rubberised compound is then poured onto the mesh, coverage rate approx 3 kg/m2, and at the same time unrolling the polymer modified protection membrane into the hot liquid.

The membrane should be taken up all upstands for a distance of at least 15 cm. Heating should take place in a thermostatically controlled boiler and must not exceed 200°C. Ideal laying temperature is between 160° and 180°C. Although installation can take place at ambient temperatures < 0° C the risk of condensation and moisture forming on the surface of the deck is such that the recommended minimum ambient laying temperature is 5°C.

Upstands - Upstands should be coated with the WILOTEKT rubberised compound before being protected with a granular or aluminium foil finished membrane such as ARMA CPV or ARMALU. Waterproofing specifications for specific details are available from Axter.

Protection - The system is then protected as required with XPS insulation and heavy protection, reservoir or drainage boards and roof garden, concrete, hot or cold rolled macadam, etc. depending upon use.

Installation video .WMV Video
A really useful video about laying Wilotekt

Microsoft Mmedia player Download
To watch the video above you will need a video player such as the Microsoft Media Player which is available free of charge direct from Microsoft if you do not already have it. Get Windows Media Player

Website copyright ©2008 Axter (UK) Limited